Warby Views Estate, Wangaratta Stages 1 to 6 146 lot residential subdivision development constructed over multiple stages. Works include: – bulk earthworks with sections of level 1 supervised fill – drainage and service installation including storm...
Mt Hotham Batter Reconstruction Works NECC was awarded the reconstruction of a 100m section of road and fill batter built on degrading ground conditions in 2021. The works comprised of: Site set out, services locating & traffic control in a National Park with...
Great Valley Trail NECC completed the Great Valley Trail project in December 2021. Featuring a 16km sealed bike track and 4 bridges between Bright and Harrietville, the project comprised of: Site Set out, services locating and service relocations Mulching, and...
Goulburn Murray Water Irrigation and Channel Upgrades The team at NECC have installed over 6.5km of HDPE Channel Lining for channel bed widths of up to 13m from 2013 to current. This work includes desilting and reforming the channel and construction of concrete sills...
Myrtleford Better Places Myrtleford Better Places including the Roundabout construction at Standish Street NECC have completed stages 1 and 2 of the Myrtleford Better Places project. With stage one being the roundabout at Standish Street where we demolished the...